E-28—Qualification of Electricity Meters for Lengthened Initial Reverification Period of 10 years
Category: ELECTRICITY
Bulletin: E-28 (rev. 7)
Document(s): S-EG-01, S-S-05, E-26
Issue Date: 2012-01-01
Effective Date: 2012-01-01
Supersedes: E-28 (rev. 6)
Table of Contents
- 1.0 Purpose & Scope
- 2.0 References
- 3.0 Initial Reverification Period Tables
- 4.0 Revision
- 5.0 Additional Information
1.0 Purpose & Scope
The purpose of this bulletin is to officially communicate the electronic electricity meters that have been conditionally and unconditionally qualified for a 10-year initial reverification period pursuant to Measurement Canada specifications S-EG-01 and S-S-05, and to communicate those meters that no longer qualify for a lengthened initial reverification period.
2.0 References
2.1 Electricity and Gas Inspection Act (R.S. 1985, c. E-4), s. 12.
2.2 Electricity and Gas Inspection Regulations (SOR/86-131), ss. 3(1), s. 19.
2.3 Specification S-EG-01, Electricity and Gas Meter Pattern Approval Applications - Quality and Measurement Reliability Information Requirements in Support of a Lengthened Initial Reverification Period
2.4 Specification S-S-05, Performance Requirements Applicable to Meters Granted a Conditionally Lengthened Initial Reverification Period under S-EG-01
3.0 Initial Reverification Period Tables
| Manufacturer | Model(s) | Approval No. | Rating/Configuration | Applicability |
|---|---|---|---|---|
| Itron |
|
AE-0920 |
|
Unconditional 10 year initial reverification period for all meters. |
| Itron |
|
AE-1132 |
|
Unconditional 10 year initial reverification period for all meters. |
| General Electric Co. |
|
AE-1059 |
|
Unconditional 10 year initial reverification period for all meters. |
| General Electric Co. |
|
AE-1342 |
|
Unconditional 10 year initial reverification period for all meters. |
| Elster Metering |
*(L, A, Q, +) / (P, M, Z, S, A) |
AE-0541 |
|
Unconditional 10 year initial reverification period for all meters. |
| Elster Metering |
*(L, A, Q, +) / (P, M, Z, S, A) |
AE-0580 |
|
Unconditional 10 year initial reverification period for all meters. |
| Elster Metering |
*(L, A, Q, +) / (P, M, Z, S, A) |
AE-0601 |
|
Unconditional 10 year initial reverification period for all meters. |
| Elster Metering |
/(Q, L, N, C, A) Model designations |
AE-1168 |
|
Unconditional 10 year initial reverification period for all meters. |
| Elster Metering |
|
AE-1320 |
|
Unconditional 10 year initial reverification period for all meters. |
| Landis + Gyr Inc. | Focus ALF | AE-1356 |
|
Unconditional 10 year initial reverification period for all meters. |
| TRIACTA Power Technologies | POWERHAWK 6320 | AE-1434 |
|
Unconditional 10 year initial reverification period for all meters. |
| Manufacturer | Model(s) | Approval No. | Rating/Configuration | Applicability |
|---|---|---|---|---|
| (Electronic electricity meters qualified for a conditional 10 year initial reverification period which are subject to additional testing prior to the end of the six year initial reverification period) | ||||
| Landis + Gyr Inc. |
|
AE-0764 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007. Sampling in accordance to S-S-05 required prior to June 2013 |
| Landis + Gyr Inc. |
|
AE-1559 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2008. Sampling in accordance to S-S-05 required prior to June 2014. |
| Elster Metering |
|
AE-1579 |
gREX:
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2008. Sampling in accordance to S-S-05 required prior to June 2014. |
| Itron |
|
AE-1466 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2006. Sampling in accordance to S-S-05 required prior to June 2012. |
| Itron |
|
AE-1498 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007. Sampling in accordance to S-S-05 required prior to June 2013. |
| General Electric Co. |
|
AE-1517 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007. Sampling in accordance to S-S-05 required prior to June 2013. |
| Sensus Metering Systems Inc |
|
AE-1611 |
|
Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2009. Sampling in accordance to S-S-05 required prior to June 2015. |
| Manufacturer | Model(s) | Approval No. | Rating/Configuration | Applicability |
|---|---|---|---|---|
| (Electronic electricity meters that no longer qualify for the conditional 10 year initial reverification period or have not completed the sampling as required in accordance with S-S-05) | ||||
| Itron |
|
AE-0828 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003. |
| Power Measurement Ltd. |
|
AE-0924 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003. |
| Power Measurement Ltd. |
|
AE-1143 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003. |
| Power Measurement Ltd. |
|
AE-1484 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003. |
| Power Measurement Ltd |
|
AE-1535 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003. |
| Sensus Metering Systems Inc |
|
AE-1145 |
|
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after Jan. 1, 2005 |
4.0 Revision
4.1 The purpose of revision 2 was to clarify and reflect the change in references from Measurement Canada provisional specification PS-E-11 to specification S-EG-01. Revision 2 amends the scope to include meters that have been conditionally and unconditionally qualified to receive a 10 year initial reverification period, and meters that no longer qualify for a lengthened initial reverification period.
4.2 The purpose of revision 3 was to add AE-1320 to table 1 and include additional configurations for AE-1611 in table 2.
4.3 The purpose of revision 4 was to add additional ratings and or configurations for AE-1611 and AE-0764 in table 2.
4.4 The purpose of revision 5 was to add additional ratings and or configurations for the meters under AE-1517 and AE-1579 in table 2. Also, meters under AE-1145 are included in table 3 to indicate a suspension of the lengthened initial reverification period until sampling pursuant to S-S-05 is completed.
4.5 The purpose of revision 6 was to add AE-1356 to table 1.
4.6 The purpose of revision 7 is to add AE-1434 to table 1.
5.0 Additional Information
For additional information regarding this bulletin, please contact the Senior Program Officer responsible for electricity measurement.
David Flieler
Senior Program Officer
Measurement Canada
